OWNER'S ENGINEERING / JAPAN

An engineer on your side for energy projects in Japan.

We work for project owners, not for contractors. For companies from outside Japan that are building or investing in energy facilities here, we read the Japanese designs, quotations and regulations and tell you what they mean before you commit.
The principal spent 13 years designing, building and commissioning LNG terminal facilities at a major Japanese EPC contractor, and handles every engagement personally.

Illustration of an engineer on the owner's side reviewing drawings and a quotation
OWNER'S SIDE

We sort out the technical questions on your side
before you negotiate with vendors and contractors.

01 / WHO WE WORK FOR

Who we work for.

Companies from outside Japan that need technical judgement on the Japanese side of a project.

DEVELOPERS

Entering Japan with a plant project

You have a site or a Japanese partner, and the designs and quotations arrive in Japanese. You need someone on your side who can check them against Japanese practice.

INVESTORS

Looking at a Japanese project before investing

You want an independent view of the design basis, the EPC price and the permitting schedule for your own investment decision.

SUPPLIERS

Delivering equipment to a customer in Japan

Your equipment has to meet Japanese codes and pass inspection here. We work through the technical requirements and documents with your engineering team.

02 / SERVICES

Services.

Scoped to the decision in front of you. A single review is fine.

01 / REGULATORY SCREENING

Japanese regulatory screening

  • Which Japanese laws and codes apply to the plant, such as the High Pressure Gas Safety Act and the Gas Business Act
  • What they require of the design, and where permits and inspections are likely to set the schedule
  • Written report in English
02 / DOCUMENT REVIEW

Design and quotation review

  • Comments on drawings, calculations, specifications and quotation breakdowns from Japanese vendors and EPC contractors
  • Where the design margin goes beyond what the codes require, we point it out and propose value engineering that keeps the safety basis intact
03 / EPC PMO

EPC project management support

  • Weekly meetings to track design, procurement and schedule issues
  • Support in technical negotiations with vendors, in English and Japanese
04 / INSPECTION

Inspection and commissioning

  • Review of inspection procedures and attendance at factory and site inspections
  • Commissioning planning and follow-up of open items
03 / SCOPE

What we do not do.

We would rather say this at the start than halfway through a project.

04 / ENGAGEMENT

How we work.

Remote by default, on site when it matters.

TYPE A / RETAINER

Advisory retainer

A monthly hour cap agreed in advance. Weekly online meetings and asynchronous review of documents.

TYPE B / SPOT

Spot engagement

A single document review, regulatory screening or inspection visit. On site only for inspections, kick-offs and similar occasions.

TERMSThe principal handles every engagement personally; nothing is subcontracted. We sign a non-disclosure agreement before receiving project documents. We work in English and Japanese, on Japan time (UTC+9).

Illustration of the flow of work: document review, negotiation, and a written report REVIEW / NEGOTIATION / REPORT
05 / WHY THE OWNER'S SIDE

Why we can sit
on your side.

The principal used to be on the other side of the table, writing the designs and quotations that owners receive. That is how he knows where the design margin sits in a Japanese quotation.

Information learned at previous employers and in client work is confidential and is never reused on other projects. Client names are not disclosed either.

06 / PRINCIPAL

Principal.

Thirteen years on the contractor side, then two years on the owner's side. The principal handles every engagement personally.

13YEARS / EPC
MECHANICAL DESIGN / CONSTRUCTION / COMMISSIONING

Contractor side

Thirteen years at a major Japanese engineering and construction company in mechanical design, construction and commissioning, mainly of LNG receiving terminals, calorific value adjustment units and boil-off gas compressor systems. Engineering manager on a geothermal power plant project, including coordination with overseas equipment vendors.

2YEARS / OWNER
FEASIBILITY STUDY / PROCUREMENT

Owner side

Two years on the owner's side of energy projects: new biomass fuel development, feasibility studies and cash flow models, and purchase specifications for EPC contractors.

QUALIFICATIONS
  • High Pressure Gas Production Safety Manager, Class A (Mechanical), Japanese national qualification
  • Passed the Japanese national Energy Manager examination (heat)
  • Passed the US Fundamentals of Engineering (FE) exam
07 / CONTACT

Contact

The Japanese site has more on our other work.

Company
Tokyo Kyodo Technology Co., Ltd.
東京共同技術株式会社
Address
Kinokuniya Bldg. 4F, 1-4-2 Ebisu-Minami, Shibuya-ku, Tokyo 150-0022, Japan
Facilities
Gas and liquefied gas facilities such as LNG, biomass plants, and other energy plants
Languages
English and Japanese
Information security
Information security policy (Japanese)
FIRST CALL FREE OF CHARGE

One hour online to sort out the technical questions on your project.

In English or Japanese. Early-stage enquiries are welcome.